Agnikul Plans ₹510 Crore Orbital Data Centre Manufacturing Facility in Andhra Pradesh

Space technology company Agnikul Cosmos plans an initial investment of ₹510 crore in a facility in Andhra Pradesh to manufacture units for orbital data centres, under an agreement signed with the state government.

The proposed facility will be located in Tirupati district. Agnikul signed the agreement on 13 November at the CII Partnership Summit in Visakhapatnam. The investment and manufacturing facility are plans; the announcement does not establish that the plant has been built or that an orbital data centre is operating.

The project builds on Agnikul’s launch-vehicle technology. The company intends to use an extendable upper stage of its rocket as a platform capable of hosting data-centre equipment in orbit. Under the proposed approach, semiconductor companies would develop graphics processing unit stacks that could be integrated with the launch vehicle’s upper stage.

Co-founder and chief executive Srinath Ravichandran said the facility would be dedicated to building orbital data-centre units and integrating the computing hardware with the upper-stage platform. The project is distinct from Agnikul’s existing launch and rocket-component work.

Bengaluru-based NeevCloud has signed on as Agnikul’s first customer. The companies’ arrangement calls for Agnikul to launch an orbital AI data-centre module developed by NeevCloud’s AI SuperCloud platform. Their earlier partnership envisaged a proof-of-concept mission, although the latest facility announcement does not establish a completed launch or commercial service.

Agnikul’s launch-vehicle programme has included the Agnibaan SOrTeD mission, which lifted off in May 2024 from the company’s privately operated launchpad at Sriharikota. The mission demonstrated technologies including a 3D-printed semi-cryogenic engine.

The company subsequently expanded its assembly and testing capabilities in Chennai. Two units inaugurated in September 2026 were intended to support testing of reusable rocket stages under flight-like conditions and in-house manufacturing of launch-vehicle components.

Ravichandran said Agnikul expected its next launch in the first half of 2027 and intended it to demonstrate reusable launch-vehicle and upper-stage technologies. The timeline is a company expectation and remains subject to execution.

The planned Tirupati facility adds a manufacturing project to Agnikul’s existing launch and integration agenda. Orbital data-centre infrastructure remains an emerging field, and the commercial deployment timetable, customer capacity and performance characteristics of Agnikul’s proposed platform were not detailed in the announcement.

- Advertisement -

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Latest Articles

Share your details to download the Research Report 2026

Share your details to download the CISO Handbook 2026

Share your details to download the report 2026

Share your details to download the Cybersecurity Report 2025

Share your details to download the CISO Handbook 2025

Sign Up for CXO Digital Pulse Newsletters

Share your details to download the Research Report

Share your details to download the Coffee Table Book

Share your details to download the Vision 2023 Research Report

Download 8 Key Insights for Manufacturing for 2023 Report

Sign Up for CISO Handbook 2023

Download India’s Cybersecurity Outlook 2023 Report

Unlock Exclusive Insights: Access the article

Download CIO VISION 2024 Report

Share your details to download the report

Share your details to download the CISO Handbook 2024

Fill your details to Watch